Wheatstone LNG Project

Location – Onslow, Western Australia
Project Owner – Chervon
ECPM – Bechtel
Date – May 2012 – Ongoing

Pilewest has designed, supplied, installed and tested steel screwpile foundations for the following buildings
  • Fly Camp
  • Dredging International – Site Offices
  • BEST JV – Site Offices
  • BAM Clough JV – Site Offices
  • Thiess – Site Offices
  • ATCO – Site Offices
  • Main Construction Village Buildings and Utilities
  • Tank Team Office
  • Port Operations Office
  • Chevron South Office
  • Bechtel South Office
  • Bechtel North Office
  • Various Crib rooms, Ice Shelters and Washrooms
Pilewest has installed over 20,000 screwpiles across the project with 1% onsite testing to AS 2159-2009 Piling – Design and installation to ensure screwpiles exceed the ultimate design loads. Pilewest is very proud of our project record with no incidences or lost days due to injuries and have met all project milestones.

Mondarra Gas Storage Facility

Location- Dongara, Western Australia
Client – Enerflex Process Pty Ltd
Date – February 2012

Working closely with Enerflex Pilewest was able to install over 550 piles in 4 days allowing a 140 man camp to be commissioned and operational within 3 months. Screwpiles were the preferred foundation solution to allow the project to be installed to such a tight timeframe with the additional benefit that they can be easily removed at the end of the project life.

Macedon Construction Camp

Location  – Onslow, Western Australia
Project Owner – BHP Billiton
ECPM – Technip
Client – OTOC Australia
Date – August 2011

Pilewest designed, supplied, installed and tested screwpiles foundations for the new 350-man new construction camp for the Macedon Gas Project, including, kitchen refuge and associated service buildings.

Pilewest undertook additional geotechnical investigation across the site to determine the existing ground conditions to enable an optimum screwpile design. Design of a new bolted adjustable top fixing bracket enabled fast and easy installation.