Beeliar Drive September 18, 2018 by Paul Friedrichs Client – RJ Vincent Design & Construct Permanent Soldier Wall – 270 LM – at Beeliar Drive. Previous Next
Bunnings Belmont September 18, 2018 by Paul Friedrichs Client – Subiaco Building Company Design and construct 70 LM of Soldier Pile Retaining Wall. Previous Next
Kiln Lane Cottesloe September 18, 2018 by Paul Friedrichs Client – Lime Street Projects Design & construct soldier pile retaining system for boundary road. Previous Next
10 Rona Street North Beach. September 18, 2018 by Paul Friedrichs Client – Dorrington Homes Construction of two retaining walls to neighbouring boundaries at 10 Rona Street, North Beach, using soldier piling. Previous Next
Claremont On The Park September 18, 2018 by Paul Friedrichs Client – BGC Construction Design & Construct Temporary Retaining System at Caleremont On The Park. Previous Next
Opal Aged Care Alfred Cove September 18, 2018 by Paul Friedrichs Client – BGC Construction Soldier Piling at Opal Aged Care, Kitchener Road, Alfred Cove. A 120 LM temporary retaining system was installed. Previous Next
503 Yelverton Drive Pindan September 18, 2018 by Paul Friedrichs Client – Pindan Construction Soldier Piling – UC InstallationDesign & Construct Temporary Retaining System – 140LM – at 503 Yelverton Dr, Midland – Pindan. Previous Next
Sherwood Apartments December 7, 2017 by Paul Friedrichs Sherwood Apartments – 21 MaylandsClient – Crystal Pacific Date – November 2017 Previous Next
Monarc Apartments January 4, 2016 by Paul Friedrichs Location – 103 Harold St, HighgateClient – Jaxon Construction Date – May 2014 Previous Next